1
Compiled by Dr. Joe Herbertson
June 2001
Sustainable Resource Processing
Australian Case Studies continued
•Comalco: Bell Bay Aluminium smelter (Tasmania)
•dry scrubbing of smelting fumes
•fluoride absorbed into ammonia, and fluoride rich ammonia reused in smelting process
•95% reduction of ducted F emissions and 70% of total F emissions
•70% reduction of water consumption
•50% reduction of aluminum fluoride
•
•Iluka : Capel Synthetic Rutile Plant (WA)
•integrated heat recovery boiler, generates 6.5 MWh electricity
•investment of ~ $ 20 million with pay back of ~ 8 years based on energy savings
•avoided wet scrubbing plant with estimated investment cost of ~ $ 9 million
•
•Sun Metals: Townsville Zinc Refinery (Queensland)
•environmental controls designed into the new plant and its construction
•zero waste water to marine environment
•total containment of stormwater
•double lined storage areas with leakage monitoring
Ref:. www.environment.gov.au/epg/environet/eecp/industry; update in July